Ignore:
Timestamp:
Mar 1, 2019 12:56:34 PM (4 years ago)
Author:
srkline
Message:

verification of the updated beam centers based on fitted arcs of Silver Behenate

File:
1 edited

Legend:

Unmodified
Added
Removed
  • sans/Dev/trunk/NCNR_User_Procedures/Reduction/VSANS/V_BroadPeak_Pix_2D.ipf

    r1119 r1131  
    3232        Prompt yDim "Enter Y dimension: " 
    3333                 
    34         Make/O/D coef_PeakPix2D = {10, 3, 10, 0.3, 10, 2, 0.1, 8, 8, 100, 100} 
     34        Make/O/D coef_PeakPix2D = {0, 3, 100, 0.5, 25, 2, 10, 8, 8, -10, 64} 
    3535//      Make/O/D tmp_Pix2D =    {10, 3, 10, 0.3, 10, 2, 0.1}            //without the pixel ctrs                                         
    3636        make/o/t parameters_PeakPix2D = {"Porod Scale", "Porod Exponent","Lorentzian Scale","Lor Screening Length","Peak position","Lorentzian Exponent","Bgd [1/cm]", "xPix size (mm)","yPix size (mm)", "xCtr (pixels)", "yCtr (pixels)"}              
Note: See TracChangeset for help on using the changeset viewer.